Our Vermeer D20x22 supports directional drilling for underground fiber pathways. Each bore requires attention to utility separation, bore depth, bend radius, drilling-fluid returns, and pullback tension.

Review route drawings, entry and exit locations, ground conditions, access, and permit requirements before mobilization.

Coordinate utility locates and potholing to verify existing facilities along the planned bore path before drilling.

Track the pilot bore, manage reaming and drilling fluid, and control conduit pullback to suit ground conditions and material limits.

Install HDPE conduit and innerduct, coordinate handhole placement and fiber installation, and document the completed route.
QualVoice delivers dependable telecom infrastructure solutions, from installation and fulfillment to construction. Our professional workforce is ready to support projects of any size or complexity.